♦ Abroad Ongoing
KHAN SHATYRY-2007
PROJECT LOCATION:ASTANA/KAZAKİSTAN
ARCHITECTURE:FOSTER AND PARTNERS - LİNEA TUSAVUL
CONTRACTOR:SEMBOL İNŞAAT A.Ş
PROJECT DESCRIPTION: The Khan Shatyry Entertainment Centre in Astana will become a dramatic civic focal point for the capital of Kazakhstan. The soaring structure, at the northern end of the new city axis, rises from a 200m elliptical base to form the highest peak on the skyline of Astana.

PERM KRASNA DOLİNA-2007

PROJECT LOCATION : PERM/RUSYA
ARCHITECTURE: GÜZEYMİMARLIK
CONTRACTOR: ANT YAPI-PROCONS A.Ş
PROJECT DESCRIPTION :Total area 195.000M2. Consisting of 3 basement floors and 27 normal floors, the structural system is concrete framework and consists of flat slabs. Dynamic analysis has been performed due to high level structure. According to unreliable soil behaviour, pile foundation was applied.
MALISHEVA SHOPPING CENTER-2007

PROJECT LOCATION:EKATERİNBURG/RUSYA
ARCHITECTURE:YENİGÜN İNŞAAT
CONTRACTOR:YENİGÜN İNŞAAT A.Ş
PROJECT DESCRIPTION: Consisting of 3 blocks which are seperated from each other by expansion joints has an area of 82000m2. First and second blocks,belong to shopping center,have 9 floors and 3rd block,office and garage, has 13 floors.The flat slab has openings of 8m per side. Pile foundation has been used.


♦ Abroad Ongoing