♦ Abroad Completed Özün Proje İnşaat Taahhüt Ticaret Limited Şirketi http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan Fri, 10 Sep 2010 09:36:39 +0300 Joomla! 1.5 - Open Source Content Management tr-tr KHAN SHATYRY-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/118-han-cadiri-2007

PROJECT LOCATION:ASTANA/KAZAKİSTAN

 

ARCHITECTURE:FOSTER AND PARTNERS - LİNEA TUSAVUL

CONTRACTOR:SEMBOL İNŞAAT A.Ş

PROJECT DESCRIPTION: The Khan Shatyry Entertainment Centre in Astana will become a dramatic civic focal point for the capital of Kazakhstan. The soaring structure, at the northern end of the new city axis, rises from a 200m elliptical base to form the highest peak on the skyline of Astana.

]]>
Yurtdışı: Tamamlanan Tue, 14 Apr 2009 14:49:49 +0300
SHATYRY RESIDENCE-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/121-cadir-konut

PROJECT LOCATION:ASTANA/KAZAKİSTAN

ARCHITECTURE:LİNEA TUSAVUL

CONTRACTOR:SEMBOL İNŞAAT A.Ş

PROJECT DESCRIPTION: These 35 floor residences are located around the Khan Shatyry and connected to each other by parking structures then connected to Shatyry Entertainment Center. Structural system consists of concrete skeleton of frames. By connecting 4 L shaped building, a square form is obtained. Raft foundation is used.

 

 

]]>
Yurtdışı: Tamamlanan Tue, 14 Apr 2009 06:21:21 +0300
ASTANA CONVENTION CENTER-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/119-astana-kongre-merkez

PROJECT LOCATION:ASTANA/KAZAKİSTAN

ARCHITECTURE:LİNEA TUSAVUL

CONTRACTOR:SEMBOL İNŞAAT A.Ş

PROJECT DESCRIPTION: Astana Convention Center was constructed on 50.000m2 area and it consists of 5.000 people conference hall, VIP halls, exhibition halls and museums. 70x70 space frame installed on roof. Flat and waffle slab systems has been used on long spans around 24m. Furthermore, outer skeleton is formed by steel structure and raft foundation was applied to this structure.

 

 

 

 

 

 

 

]]>
Yurtdışı: Tamamlanan Mon, 13 Apr 2009 11:53:17 +0300
CEMIA SHOPPING CENTER 2nd LEG-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/130-cema-aliver-merkez-2etap

PROJECT LOCATION: PERM/RUSYA

ARCHITECTURE: UZ MİMARLIK

CONTRACTOR: ANT YAPI-PROCONS A.Ş

PROJECT DESCRIPTION: Total area is 35.000M2 and it consists of 3 blocks and 5 floors.Structural system is applied as concrete skeleton frame and flat slabs. An 16m length tramcar way is passed through the structure and a basement is located under the tramcar way.

 

]]>
Yurtdışı: Tamamlanan Tue, 14 Apr 2009 12:22:28 +0300
SHABIT ARTS AND CULTURE CENTER -2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/120-shabt-2007

 

PROJECT LOCATION :ASTANA/KAZAKİSTAN

ARCHITECTURE:LİNEA TUSAVUL

CONTRACTOR:BAZİZ A CONSTRUCTION INDUSTRY AND COMMERCE INC.(KAZAK COMPANY)

PROJECT DESCRIPTION:Total area of this structure is 30.000m2.Structural system consists of concrete skeleton frame. Inclined columns starting from foundation gets together on the roof. Those spiral columns have different dimensions on each axis. Dimensions of flat slab changes through the structure and the raft foundation is supported by piles.

 

 

 

 

 

 

]]>
Yurtdışı: Tamamlanan Tue, 14 Apr 2009 05:11:29 +0300
MALL-DOVA SHOPPING CENTER-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/124-mall-dova-aliver-merkez

PROJECT LOCATION: KİŞİNEV/MOLDOVA

ARCHITECTURE: BOYUT MİMARLIK -BOZKURT GÜRSOYTIRAK

CONTRACTOR: SUMMA A.Ş

PROJECT DESCRIPTION:Total area is 70000 m2. Consists of 6 blocks  which have 8 floors. First 2 floors are garage and the rest belong to shopping mall. Since Kişinev is in 1st degree Eq zone, plate,beam system and mat foundation is used in that building.

 

]]>
Yurtdışı: Tamamlanan Tue, 14 Apr 2009 09:06:56 +0300
DJIBUTI RESIDENCE-2008 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/142-djbut-resdence

PROJECT LOCATION: DJIBUTI

ARCHITECTURE: PROFİL MİMARLIK

CONTRACTOR: ODEBRECHT/BRASIL

ABOUT: 5.000M2 AREA

]]>
Yurtdışı: Tamamlanan Wed, 15 Apr 2009 10:43:01 +0300
JOHN DEERE FACTORY-2008 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/143-john-deere-fabrka

PROJECT LOCATION: KOKSHETAU/KAZAKİSTAN

ARCHITECTURE:

CONTRACTOR:

PROJECT DESCRIPTION :Total Area is 25.000M2.

]]>
Yurtdışı: Tamamlanan Wed, 15 Apr 2009 10:48:37 +0300
ASTANA UNIVERSITY-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/144-astana-uenverstes

PROJECT LOCATION: ASTANA/KAZAKİSTAN

ARCHITECTURE:

CONTRACTOR:

PROJECT DESCRIPTION:Total area is 400.000M2.

]]>
Yurtdışı: Tamamlanan Wed, 15 Apr 2009 10:51:15 +0300
KRASNAYARSK TRADES CENTER-2007 http://eng.ozunproje.com/index.php/referanslar/yurtdisitamamlanan/13-yurtd-tamamlanan/127-krasnayarsk-aliver-ve-tcaret-merkez-2007
PROJECT LOCATION: KRASNAYARSK / RUSYA FEDERASYONU

ARCHITECTURE: ARTUSHYAK ARCHITECTURAL OFFİCE

CONTRACTOR: YENİGÜN A.Ş

PROJECT DESCRIPTION: Total area is 60.000 M2 and the building has 5 floors. It's formed by 25 cm thick flat slabs which have 1200 cm x900 cm  spans and constructed as a concrete skeleton frame. Cause of poor soil conditions, pile foundation is applied.

]]>
Yurtdışı: Tamamlanan Tue, 14 Apr 2009 11:11:37 +0300