♦ Abroad Completed
MALL-DOVA SHOPPING CENTER-2007

PROJECT LOCATION: KİŞİNEV/MOLDOVA
ARCHITECTURE: BOYUT MİMARLIK -BOZKURT GÜRSOYTIRAK
CONTRACTOR: SUMMA A.Ş
PROJECT DESCRIPTION:Total area is 70000 m2. Consists of 6 blocks which have 8 floors. First 2 floors are garage and the rest belong to shopping mall. Since Kişinev is in 1st degree Eq zone, plate,beam system and mat foundation is used in that building.

DJIBUTI RESIDENCE-2008

PROJECT LOCATION: DJIBUTI
ARCHITECTURE: PROFİL MİMARLIK
CONTRACTOR: ODEBRECHT/BRASIL
ABOUT: 5.000M2 AREA

JOHN DEERE FACTORY-2008

PROJECT LOCATION: KOKSHETAU/KAZAKİSTAN
ARCHITECTURE:
CONTRACTOR:
PROJECT DESCRIPTION :Total Area is 25.000M2.
ASTANA UNIVERSITY-2007

PROJECT LOCATION: ASTANA/KAZAKİSTAN
ARCHITECTURE:
CONTRACTOR:
PROJECT DESCRIPTION:Total area is 400.000M2.
KRASNAYARSK TRADES CENTER-2007

PROJECT LOCATION: KRASNAYARSK / RUSYA FEDERASYONU
ARCHITECTURE: ARTUSHYAK ARCHITECTURAL OFFİCE
CONTRACTOR: YENİGÜN A.Ş
PROJECT DESCRIPTION: Total area is 60.000 M2 and the building has 5 floors. It's formed by 25 cm thick flat slabs which have 1200 cm x900 cm spans and constructed as a concrete skeleton frame. Cause of poor soil conditions, pile foundation is applied.


♦ Abroad Completed